Home
Overview
Links

Empennage
Inventory
Vertical Stabilizer
Rudder
Horizontal Stabilizer
AirVenture 2006
Horizontal Stab. Cont.
Elevators
Elevators Part 2
Tailcone

Wings
Main Spar
Main Ribs
Rear Spar/Top Skins
Leading Edges
Fuel Tanks
Fuel Tanks continued
Ailerons
Flaps

Fuselage
25-26:Getting Started
27:Firewall
28:Forward Ribs/Skins
29:Fuse Side Skins
30-31:Steps, Fwd Fuse
32-33:Tailcone, Baggage
34-35:Baggage Door, Etc.
36-37:Brake & Fuel Lines

Finishing Kit
38-39:Brake/Rudder Pedals
40-41:Flaps/Fwd Fuse
42:Cabin Top
Instrument Panel
43:Cabin Cover
45:Doors
Overhead Console

Firewall Forward

Systems
Instruments
Antennas


Previous: Section 29

   

Section 30

   

4/8/08 - Steps - 2 hrs

I know as soon as I install the steps that I will start kicking into them whenever I walk around the plane. I think I still have bruises on my shins from the last plane.

The steps run through the steel bracket on the outside rib and into a UHMW block attached to an inboard rib.

 

   
 
   
 
   

4/10/08 - Forward Fuse - 2 hrs

Section 31

   

4/11/08 - Forward Skin - 2 hrs

 

   

4/12/08 - Instrument Panel - 3 hrs

   

4/13/08 - Misc. - 1 hour

   

Next: Tailcone Attachment